Changle Factory

Changle Factory

Metal Coffee Table Specifications and Checks

Define the material, dimensions, surface color, table design, branding, and packaging through drawings or a reference sample. Checks during production and before shipment refer to the mutually approved version.

Quality control

Key inspections cover the tabletop, table legs, and manually welded joints. Surface color, structural assembly, and appearance are checked against the confirmed order documentation, and inspection results are recorded. Any abnormal welds, deformation, scratches, or color variations are isolated and labeled before repair or replacement is agreed upon. Before shipment, quantities, dimensions, and accessories are verified against the approved sample or drawings.

Minimum order100 Pieces
Production lead time20–30 Days
PaymentT/T, L/C, 30% Deposit, Balance Paid in Full Before Shipment, Negotiable by Order

Metal Coffee Table

Material Confirmed According to Order Specifications | Optional Surface Colors

Checks tied to the approved order

  • Drawing-Based Customization Available
  • Sampling Available

Customization

Dimensions, materials, surface colors, tabletop and table-leg designs, branding, and packaging methods can all be discussed as part of drawing-based customization. A confirmation document is first prepared based on the buyer's drawings, dimension specifications, or reference samples, followed by sampling to verify the structure, appearance, and assembly. During mass production, key dimensions, colors, and process consistency are checked against the version approved by both parties.

Packaging & shipping

Tabletop edges, corners, surfaces, and welded joints require protective separation, corner guards, or cushioning. The specific packaging structure is agreed upon based on product dimensions and order requirements. During packing, table legs, connectors, installation accessories, and instruction materials are counted, and carton quantities and markings are verified. Outer-carton details and delivery documentation are then confirmed based on the African destination, transportation method, shipment batch, and consignee information.

Solutions

Home Crafts

Africa

ProductMetal Coffee Table
Product detailsMaterial Confirmed According to Order Specifications | Optional Surface Colors
Minimum order100 Pieces
Lead time20–30 Days
PaymentT/T, L/C, 30% Deposit, Balance Paid in Full Before Shipment, Negotiable by Order
CustomizationDimensions, materials, surface colors, tabletop and table-leg designs, branding, and packaging methods can all be discussed as part of drawing-based customization. A confirmation document is first prepared based on the buyer's drawings, dimension specifications, or reference samples, followed by sampling to verify the structure, appearance, and assembly. During mass production, key dimensions, colors, and process consistency are checked against the version approved by both parties.
Quality controlKey inspections cover the tabletop, table legs, and manually welded joints. Surface color, structural assembly, and appearance are checked against the confirmed order documentation, and inspection results are recorded. Any abnormal welds, deformation, scratches, or color variations are isolated and labeled before repair or replacement is agreed upon. Before shipment, quantities, dimensions, and accessories are verified against the approved sample or drawings.
Packaging & shippingTabletop edges, corners, surfaces, and welded joints require protective separation, corner guards, or cushioning. The specific packaging structure is agreed upon based on product dimensions and order requirements. During packing, table legs, connectors, installation accessories, and instruction materials are counted, and carton quantities and markings are verified. Outer-carton details and delivery documentation are then confirmed based on the African destination, transportation method, shipment batch, and consignee information.
ApplicationsHome Crafts
MarketsAfrica

Request a metal coffee table quote

Send your specification, quantity, African destination, packaging needs, and requested quality criteria. The MOQ is 100 pieces and the stated production lead time is 20–30 days.

Request a quote ↗
WhatsApp ↗